Major challenges facing the IPP industry
IPPs need offtake for their BESS and RES in line with their risk profile and tailored to country-specific subsidy schemes and grid fees.
of RES contracted & optimised todayof BESS contracted & optimised today
higher value creation than market benchmark*
[*confirmed by independent consultant]
Our solution
to ensure maximum
value creation of your assets
Veolia, through its Flexcity offer Flexcity is an one-stop shop, full-merchant joint or separate offtake solutions for your BESS and RES assets.
Through our cross-market optimization, incorporating local subsidy schemes and grid fees, powered by our automated optimization engine and supported by expertise of our local trading teams, we ensure maximum value creation.
Frederik Jansen |
|
Customer benefits:
Optimisation
and sustainability
Best-in-class cross-market optimization
―
They trust us
|
|
|
Case study:
ESG: Maximising Revenues from a 15 MW Co-located BESS
With Veolia’s Flexcity offer and enspired, ESG optimises its 15 MW co-located battery across aFRR and wholesale markets to maximise revenues.
|
Case study:
E-Connection unlocks 20 MW of grid flexibility at OSKneT
With Veolia’s Flexcity offer, E-Connection combines 20 MW of battery storage with 88 MW of wind to optimise revenues across balancing, wholesale and congestion markets.
Matthijs van Eck |
|